Category: Industrial/Special Projects

Unilever Mashreq Factory Renovation & Refurnishing

Client: Unilever Project Location: 6th of October City, Egypt Consultant: ECG Project Duration: 10 Months Start date: October 2015 Project Description: Renovation of Existing Production & Packing Facility TBUA: 13000 M2, Including: Civil Works, Electrical, HVAC & Firefighting Works & Process Equipment & Piping Installation. Main Items: Civil & MEP Works

HENKEL-CHANGE CIVIL CONSTRUCTION PHASE I & II

Client: Henkel Project Location: 6th of October City, Egypt Consultant: EHAF Project Duration: 11 Months Start date: May 2016 Project Description: Total Area: 77000 m2 Including: Excavation, Backfilling, Soil Replacement, Concrete Works, Masonry Works, Structural Steel Works, Thermal and Moisture Protection Works. Main Items: Civil & MEP Works

Bonjorno Factory

Client: Caravan Marketing Company Confidential Project Location: 6th of October City, Egypt Consultant: Moamen Afify Project Duration: 8 Months Start date: February 2016 Project Description: The project consists of the following: Zone A (Concrete Building): ( GR floor + 1st floor + 2nd floor + roof) Floor high 4.00 meter ( finish to finish ) Build up […]

Edita E08 Factory

Client: Edita Food Industries S.A.E Project Location: 6th of October City, Egypt Consultant: SNC Lavalin Egypt L.L.C. Project Duration: 12 Months Start date: January 2016 Project Description: The scope of works includes labor, supervision, tools, materials, equipment, construction machinery and the services and utilities required to complete the Work described in the Tender Documents as follow: Phase […]

Hangar 7000 (Egypt Air Maintenance & Engineering)

Client: Egypt Air Maintenance & Engineering Project Location: Cairo Consultant: ACE consulting engineers ( Moharram Bakhoum ) Project Duration: 20 Months Start date: September 2014 Project Description: BUA = 29,463 m2, Rehabilitation of Existing Building Including Demolition of Existing Finishing & Concrete Works, Concrete of New Building, Finishing & MEP. Main Items: Demolition, Concrete for new structures, […]

UNILEVER

  Client: Unilever Egypt Location: 6th Of October City Consultant: Bahaa El Monofy Project Duration: 6 Months Start date: 2003 Project Description: Turn Key project on 13000 m2 area including administration building, fabrication build­ing, steel water tanks, generators, electrical rooms, chiller rooms and fences. Main Items: Civil works, steel structure Electro mechanical, fire fighting & […]

SCHNEIDER FACTORY

  Client: Schneider Electric Location: Badr City Consultant: Arab Osama El Husseny Project Duration: 12 Months Start date: 2008 Project Description: One of the best looking factory in Badr city, consists of workshop 12,000 m2 and an administration building of 3000 m2 plus several utility buildings. Main Items: Civil works, Steel structure, Mechanical works & […]

Edita Factory (Phase2)

  Client: Edita Food Project Location: 6th of October City Consultant: Engineering Consulting Corporation (ECC) Project Duration: 15 months Start date: November 2013 Project Description: Total BUA = 12,000 m2 Including Steel Structure Production building, Concrete Admin Building, Boiler Shed, Landscape. Main Items: Concrete for structures, Steel Structure for Production Building, Lase Finished Concrete SOG […]

CHIPSY FACTORY (PEPSICO INTERNATIONAL)

Client: Pepsico international Location: 6th Of October City Consultant: Al Hosny for Engineering consultations Project Duration: 24 Months Start date: 2007 Project Description: The project was built on two phases, it consists of administration building, 2 Doritos factories, four warehouses, several utility buildings & water treatment station. Main Items: Civil, steel structure, architectural works, electromechanical, […]

Kraft Factory

  Client: Kraft Foods Location: Borg El Arab – Alexandria Consultant: Cairo Consult Project Duration: 10 Months Start date: 2012 Project Description: The Project spans on 32,000 project scope is development and renewal of plant-based flat about 8140m’ and include the work of strengthening, the existing truss concrete floors work, Sandwich panels, Epoxy and Electromechanical, […]