Edita E08 Factory

Picture1
  • Client: Edita Food Industries S.A.E
  • Project Location: 6th of October City, Egypt
  • Consultant: SNC Lavalin Egypt L.L.C.
  • Project Duration: 12 Months
  • Start date: January 2016

Project Description:

The scope of works includes labor, supervision, tools, materials, equipment, construction machinery and the services and utilities required to complete the Work described in the Tender Documents as follow:

Phase 1:

Production building: Basement floor (area = 4100 m2, height 8.5m)

Ground floor ( area = 16600 m2, height 13/15 m) Frist floor (area for production bldg. = 2600 m2 height 3.8 m)

Administration building:

Ground floor (area = 1800 m2, height 3.8 m) Frist floor (area = 1800 m2

Total BUA =26900 m2

Layout: Eternal works = 24500 m2 Fence length  =1075

Main Items:

Civil & MEP Works